Guide Bridge Station - New Ticket Office

STG was contracted to remove an existing glazed shelter at Guide Bridge Station and construct a new ticket office with staff areas, sales counter and ticket hall.

Cost
£350k
Duration
5 months
Location
Manchester
Sector
Transport
Client
Northern Rail
- Client:

Due to the existing layout and operational nature of the premises, enabling works were required initially to ensure safe day-to-day operations during the works. This included segregating work areas and installing suitable directional/warning signage. Car park extension work was in progress at the time of this scheme under the control of another contractor; STG carefully managed all works in close liaison with this firm to protect the safety of all on site.

A bespoke structure was created to form the new ticket hall, office, staff area and stores. This was constructed from concrete raft foundations, a steel portal frame, external rain-screen cladding and steel profile roofing system. Internally the structure was fitted out and existing areas were refurbished ready for immediate occupation.

Contact Us